The erection of the Waller Training Building on Whale Island, Portsmouth, Hampshire.

A view from inside the Waller Training Building under construction on Whale Island, Portsmouth. The steel framing is complete and one end wall are complete. A concrete floor has been laid in one side of the building and a large hole has been formed in the middle of the building. Large wooden formers are being fitted by a gang of four workmen. The negative is slightly cracked.

Object details

ID: N25588
Type: Negative
Materials: Glass plate negative; Plastic tape.
Display location: Not on display
Date made: 1 July 1944
Credit: National Maritime Museum, Greenwich, London
Measurements: Overall: 101 mm x 127 mm